Location: Holborn, London
High Holborn
Project Value: £580,000
Duration: 8 Weeks
This project was the full refurbishment of an office space. The space consisted of three floors including a basement. The office included reception, desk areas, meeting rooms, phone booths, kitchen, breakout area, showers and a bike store.
Mechanical Building Services
-
Ventilation (supply & extract)
-
HVRF
-
Plumbing to tea points & showers
-
Air Conditioning
-
Under floor heating
-
Building Energy Management Equipment & Control Panels
-
Water treatment (flushing and chlorination)
-
Air & Water Balancing
-
Insulation / Cladding
Electrical Building Services
-
Mains Power Distribution Board
-
Addressable Fire Detection
-
Lo carbon Lighting
-
Emergency Lighting
-
General Small Power
-
Structured Cabling
-
Access Control
Challenges Overcome:
This was a fast paced project with a very short program. On top of this there was noise restrictions which meant we could only drill at certain times of the day. This required additional planning and co-ordination to ensure the program was met.